top of page

 

 

 

Below are some case studies of recent works at educational establishments that we have completed, these includethe installtion of sun shades, WC refurbishments and perimeter fencing which is just a small example of the works we undertake at Stacks. 

EDUCATIONAL PROJECTS

Sun Shade / 
Outside Classroom
Kingstanding
School entrance,
Perry Common 

 

We dug up the area removing existing fixings then we installed timber posts to support the new sun shade sail where students will be able to enjoy the outside. We also laid new artificial grass with shock pads as underlay making the area suitable for school and educational needs. 

 

WC refurbishment 
Small Heath

 

 

At Perry Common we built a new entrance to the school which consisted of a UPVC construction fully glazed and with new flooring to the entrance and newly laid tarmac around the construction. 

 

 

New perimeter fencing & gates,
Lakeside

We stripped out all existing sanitary ware, supplying and fitting new WC’s and basins. We also installed new toilet cubicles and vanity units and carried out full decorations and laid new floor finishes.  

 

 

We started by dismantling the existing fence and clearing the area, we then installed new palisade fencing which incorporated electrical security gates to make the site more secure for student safety. 

 

 

bottom of page